YMCA Y-Camp at Horsethief Reservoir

Granite Excavation, Inc. excavated 150,000 cubic yards from a hillside in order to construct (2) 400,000 gallon aeration ponds and a one million gallon treatment pond. Granite’s grade crews constructed over a mile of roadway along with the Lagoon Construction.

Granite’s pipe crews installed over 10,000 lineal feet of Sanitary Sewer and a 20′ deep lift station.

Granite’s pipe crews also installed over 15,000 feet of 4″ domestic water main and 8″ fire protection water main. This is just part of a complete project that Granite has been working on over the last 4 years.