Springhill Phase 2

Granite was subcontracted to complete the underground utility portion of this project in Kuna which consisted of the following.
1. Sewer Main
2. Sewer Services
3. Water Main
4. Water Services
5. Storm Drain and Seepage Beds
6. Onsite Pressure Irrigation Main
7. PI Services
The installation of the above utilities was completed in lava rock and required rock excavation, trenching, and hammering. Granite coordinated the entire duration with the prime contractor, common trench, and city inspectors to ensure project milestones were met.