Eagle Nest Phases 1-2

Cascade, Idaho. This was a 2 year project that included construction of nearly 8 miles of 24 foot wide roadway. Granite Excavation, Inc. was also responsible for wetland mitigation and culvert installation in the roadways. This project had an excavation of nearly 500,000 yards of material much of which was very solid rock.

We were also in charge of placing 6 inches of road mix on the roadways. Doing this project also led us to numerous driveways and residential excavations in this subdivision.