Amazon Falls

Granite is the GC for this project that will be completed summer of 2021. Work has consisted of the following:
1. Pressure Sewer
2. Lift Station
3. Sewer Main
4. Sewer Services
5. Water Main
6. Water Services
7. Water Main Bore
8. Storm Drain
9. Seepage Beds
10. Pressure Irrigation
11. PI Pump Station
12. PI Services
13. Gravity Irrigation
14. Clearing & Grubbing
15. Excavation/Embankment
16. Roadway/Sidewalk/Curb & Gutter Prep
17. Paving
18. Site Lighting
19. Striping & Signage
This project included the install of a lift station and sewer line at 32’ below the surface which required intricate dewatering plans to facilitate construction. Right of Way Improvements along Hwy 44 included a water main bore, new ITD turn lane, and pressure sewer all which required coordination with ITD, City of Star, the traffic control company to ensure employee safety while maintaining the construction schedule.