VA Hospital Storm Drain

Storm drain, sewer, and parking lot project in Sheridan, WY. Granite Excavation’s pipe crews replaced 3,500 feet of and existing sewer main that was failing with new 6″ and 8″ Gravity Sewer by open trench excavation methods.

Because many of the existing sewer mains at the VA Hospital ran underneath existing buildings and other permanent structures; Granite’s pipe crews also installed another 3,000 Feet of 8″ Sewer by Pipe Burst methods. Also affiliated with this project Granite’s pipe crews installed a new storm drain system and misc water main and service upgrades.

Granite’s grade and pave crews excavated, sub graded, installed sub base and base aggregates, and asphalt paved seven parking lots. This $1.1 million dollar project came in on budget and within contract times.